The snapshot below shows the Pressures, before the purging:
- in the High Pressure Branches A and B respectively HPT-A=267,1 and HPT-B=267,6 Bars
- in the Low Pressure Branch A and B respectively LPT-A =3,6 and LPT -B=4 Bars.
The procedure says that the purging needs to be done when the Pressure in the Low Pressure Branch is above 3,5 Bars. Therefore Low Pressure Branches A and B have to be purged today.
The short movie below, shot on the Control Ground System Screen, shows in real time the purging of the Low Pressure Branch B by mean of thruster activation (OCT B1) for 10 seconds. The pressure drops from 4 to 2,7 Bars (unfortunately, due to movie conversion, the display of LPT-B Pressure is hardly readable, but the appearing and disappearing green rectangle shows the 10 seconds thruster activation that causes this pressure drop)
1 hour later, the pressure in branches A and B stabilizes and the final measurements can be recorded (LPT-A and B = 2,9 bars).
Purging successful!
Let's only wish now that next time, this operation will be done not on the ground,...but in space :-)
Note: This activity was performed by Gehrard from ASTRIUM, arrived at Baikonur on Friday 12/3/2010. We are therefor, as from this date, a team of 2 to babysit Cryosat-2.