... and transported towards Platform A.
After slowly moving down the SC till the the adatpor has reached its nominal place at the bottom of Platform A, CryoSat-2 is "half" encapuslated.
Last chance to remove the last red tag items
Here, Wolfgang is removing a lifting bracket.
This item as you can see was used till the very last minute for this activity.
...and install the last green tag items. Here a balance mass.
Note the use of a 10 tons crane for a few kgs cube of bronze! :-)
After this step a last careful visual inspection is performed.
A unique opportunity to see the mirrors of Laser Retro Reflector (on left) without their caps.
Then... the last part of the encapsulation can start.